For a large-scale project, Levvel (formerly part of BAM) contracted Abeko for specialist deep dredging. An assignment where strength, precision, and reliable equipment were key.
In 2024, Abeko dredged a total of 120,000 cubic meters of material to a depth of -21 meters for Levvel. This work formed part of a large-scale Dutch infrastructure project where accuracy, capacity, and reliability were essential.
For this job, Abeko Server 1 was deployed: our heavily equipped work unit with a 250-ton excavator and a maximum reach of 24.5 meters depth. Thanks to the combination of strength, stability, and the advanced Teledyne survey system, the work could be carried out in a controlled manner and fully according to specification.
The combination of large volume and great depth makes this project a clear example of Abeko’s strength in specialized dredging solutions.
The entire project — from the supply and handling of riprap to placement and coordination with local stakeholders — was carried out independently by Abeko. Thanks to thorough preparation and direct communication on site, we were able to act quickly and deliver according to schedule.
Are you looking for an experienced partner for dredging, hydraulic engineering or heavy handling? We are ready with professionals, our own equipment and a practical approach. Leave your details - and we will contact you.