In 2017/2018, Abeko carried out an environmental project in the port of Copenhagen, Denmark, commissioned by Mobius. The work consisted of carefully removing contaminated material from a depth of -18 meters.
For this job, a 5 m³ closed grab was used, fitted with rubber flaps on the top. This adjustment minimized spillage and the spread of dredged material during lifting — essential for environmentally sensitive work.
Thanks to our experience with specialist dredging and the use of suitable equipment, this project was carried out in accordance with all applicable requirements and in good cooperation with the parties involved.
From execution to coordination with the client and local authorities, the entire operation was managed in-house. This ensured quality, transparency, and minimal environmental impact — exactly what is required for projects with heightened ecological demands.
Are you looking for an experienced partner for dredging, hydraulic engineering or heavy handling? We are ready with professionals, our own equipment and a practical approach. Leave your details - and we will contact you.