In the coastal town of Fouka, Algeria, Abeko contributed to the installation of underground pipelines for a new desalination plant. A technically challenging project where experience, strength, and precision were essential.
In 2024/2025, Abeko supported trenching for two underground pipelines for a desalination plant in Fouka, Algeria. The work took place in hard soil conditions, where powerful and reliable equipment was essential.
For this project, Abeko Server 1 was deployed — our fully equipped work unit with a 250-ton excavator and a digging depth of up to 24.5 meters. Thanks to its stability and strength, Server 1 was ideally suited for loosening and excavating hard layers, with minimal disturbance to the surrounding terrain.
The work was carried out in close cooperation with local contractors and according to a tight schedule, aligned with the broader development of the region’s water infrastructure.
Even in challenging international conditions, such as in Algeria, Abeko carries out the work under its own management — with a dedicated team, familiar equipment, and clear agreements. This way, we maintain control over quality, planning, and execution, anywhere in the world.