Handling of construction wood cargo.
At our terminal in Beverwijk, Abeko handles the loading and unloading of construction timber arriving by sea container or coaster. With an efficient workflow and powerful equipment, we ensure the smooth handling of this natural building material.
Our strength in Beverwijk.
In-house cargo crane
Experienced staff
Fast turnaround time
Efficient scrap handling.
Timber handling operations at the quay
At the port of Beverwijk, Abeko regularly receives shipments of construction timber for the building and carpentry industry. The cargo is unloaded from seagoing or inland vessels and either stored at our quay site or prepared directly for onward transport.
With our own transshipment crane and experienced operators, we can handle the timber safely and efficiently. Thanks to our location on the North Sea Canal and direct connections to the hinterland, smooth onward transport is guaranteed — both by road and by water.
Why choose Abeko?
Reliable, Flexible, Experienced.
- Terminal on the waterfront
- Experienced transshipment team
- Fast cargo handling
- Direct communication lines
- Located on the North Sea Canal
- In-house logistics
Full project delivery under our own management.
Abeko manages the entire process in-house: from unloading and storage to transport and coordination with all parties involved. Thanks to our practical approach and clear communication, timber handling is carried out safely and according to schedule.
Globally active, constantly in motion.
Years of service
Finished Projects
countries and counting
contact
Will your project be next?
Are you looking for an experienced partner for dredging, hydraulic engineering or heavy handling? We are ready with professionals, our own equipment and a practical approach. Leave your details - and we will contact you.