The work involved loading a seagoing vessel with bulk construction materials such as sand, gravel, or mixed aggregate — directly from Abeko’s site on the Kanaalweg. With the use of shovels, loaders, and an experienced team, the loading process was carried out smoothly and without delay.
The favorable location on the North Sea Canal provides quick access to international waterways, allowing construction materials to be easily transported by ship to both domestic and international destinations.
The entire loading process was carried out independently by Abeko. From preparation and equipment planning to execution and coordination with the vessel — everything was managed in-house and according to a tight schedule, with minimal waiting time at the quay.